Ten years in the same yard
A welding shop for villa gates
Cutting, welding and fitting for villas around Foshan. Coating went out to a subcontractor — and that is exactly where the rust complaints came from.
Our own powder line
Pretreatment, powder booth and curing oven moved in-house. Edge rust stopped being a conversation we had with customers.
First containers out
The Gulf and West Africa first, then Asia and Europe. Six regions now, still one plant and one QC sheet.
140,000 m a year
A second welding bay and a longer packing floor. The constraint moved from machines to skilled welders, which is a better problem to have.
No steel, no cast iron, no timber-look transfer film. One material means one set of welding settings, one pretreatment bath, and one warranty we can actually stand behind.
What you see on a plant visit
Five steps, one building
Cut to the drawing
Double-head saw, mitred and de-burred. Offcuts go back to the rack, not the bin.
Welded in a jig
The steel jig holds the diagonal before the first tack, so square is not a correction later.
Dressed, then checked
Seams ground flush and inspected. There is no filler over a gap on anything that leaves here.
Pretreat, then powder
Chrome-free conversion coat, 60–80 μm polyester powder, cured at 200 °C.
Then it is checked
Six checks before the crate closes — see the list in the next section.
Six checks before a crate closes
- Wall thickness — measured on every incoming extrusion batch, 1.5–2.5 mm as drawn.
- Film thickness — read at four points per leaf, 60–80 μm, recorded by leaf number.
- Adhesion — cross-hatch pull-off on a coupon from the same coating batch, Class 0.
- Salt spray — 1,000 h neutral salt spray on a coated coupon, read at 500 and 1,000 h.
- Hardware — every hinge, lock and drop bolt trial-fitted; nothing ships untried.
- Pre-crate fit — leaves hung against the frame at full size, then paired and crated.


Paper, where we have it
Three things we will not do

No printed wood grain
A transfer film on aluminium will lift at the edges within two years outdoors. We do not offer it, even when a project asks for it.

No order without a drawing
If we cannot draw the opening, we cannot warrant the gate. Every order starts with a shop drawing you approve, and that drawing is the contract.

No filler over a gap
A sanding pit that gets powder over it becomes a warranty claim in twelve months. It gets welded and re-dressed instead.
What buyers say
Quote to be supplied — one sentence about lead time, the finish, or how the crate arrived on site.
Quote to be supplied — what a reorder or a second container from the same customer said.
Quote to be supplied — something specific about the drawing stage or the QC photos.

Come and walk the yard
Foshan, Guangdong — 30 minutes from Guangzhou South. Weekday visits in English or Mandarin, about two hours: the coating line, the welding bay, and whatever is crated that week.
- Guangzhou South station30 min
- Baiyun Airport (CAN)90 min
- Shekou port, Shenzhen2 h